Demolition of existing and construction of new toilet facilities including accessible toilets. Supply and installation of all new waterproofing, tiling, fixtures and fittings, lighting, ventilation and Dyson Airblade hand dryers. Bird-proofing; de-cluttering; concourse and platform tiling; polishing of scratched glass and replacement of broken glass; Heritage building repairs, replacement of vitra-panels, supply and installation of stair-nosings and tactile ground indicators, tree removal, garden maintenance and landscaping, replacement of fluorescent lighting with LED, replacement of platform seating and rubbish bins, spot replacement of asphalt on platforms, improvements to platform drainage, repair and make good to redundant concrete footings and signage, painting works including to Heritage structures and deep cleaning of all hard surfaces including gum removal. Most work completed during normal hours while stations operated normally.
At Central Station we scheduled and delivered a major refresh under a Ministerial Directive – Operation Sparkle – over 12 weeks. The project involved the repainting of all external windows at Central and the repair and repainting of all public areas on Platforms 1 through 23. We also provided upgrade works to the pedestrian walkway and platforms 24 and 25 and lined and painted the columns above the Eastern Suburbs Railway. We established our site the same day the order was received and commenced all works immediately after generating site specific plans. We mobilised our team to complete the Traffic Management Plan, Environmental Plan, Program and methodology and these were all integrated into our Site Specific Management Plan and submitted for review within 24 hours of contract award.