Enfield Aquatic Centre

Location:

Enfield
VALUE:
$600k
Client:
Burwood Council
Duration:
3 weeks

This project involved refurbishment of the 25 metre indoor heated pool. We replaced and re-grouted the pool tiles and installed earth bonding for all metal elements. We also provided a new electrical switchboard, replaced the heat pumps and chlorine tanks, upgraded the balance tanks and both 25 and 50 metre pool plant rooms, as well as providing a structural concrete slab for the gymnasium and utilities room ahead of the required season opening of the pool complex.