
Clyde Maintenance Depot
Location:
Clyde- VALUE:
- $1.5m
- Client:
- RailCorp / Sydney Trains
- Duration:
- 6 months
Construction of a new 400 square metre maintenance depot building, adjacent to active rail tracks and an existing RailCorp depot. Structural steel frame, clad in metal and featuring two high-bay roller shutter doors. The project also involved the demolition and rebuilding of parking and hard-stand areas.